Logo link to homepage

Global Volcanism Program | Image GVP-07315

A night-time view shows a drill site at the Berlín geothermal area on the NW flank of Tecapa volcano.  The Berlín Boca Pozo 1 site has an installed capacity of 10 MW and came on line in 1991.  The El Tronador site began commercial operation in 1992 and generated 8 MW of power. Photo courtesy of Comisión Ejecutiva Hidroeléctricia del Río Lempa (CEL).

A night-time view shows a drill site at the Berlín geothermal area on the NW flank of Tecapa volcano. The Berlín Boca Pozo 1 site has an installed capacity of 10 MW and came on line in 1991. The El Tronador site began commercial operation in 1992 and generated 8 MW of power.

Photo courtesy of Comisión Ejecutiva Hidroeléctricia del Río Lempa (CEL).

Creative Commons Icon This image is made available under the Creative Commons BY-NC-ND 4.0 license terms.


Tecapa